Water Sanitation and Hygiene - Nawandyo A - Namutumba
Visit by David Balimunsi on 2018-05-28
Report ID
1781
Created by
David Balimunsi
Created date
2018-05-28 17:51:02 UTC
Modified by
David Balimunsi
Modified date
2018-05-29 05:25:09 UTC
Trip Time
09:38-18:42 (9 h 4 m)
Village Time
12:11-15:20 (3 h 9 m)
Travel Time
5 h 55 m
Current State
Participation Rating
0
Success
Of the five people who dint have a toilet only two are the only ones missing to complete their latrines.
Village Critical Needs
Clean water and sanitation improvements .
Village Action Steps
It is to work and improve on some of their remaining home hygiene facilities.
Staff Action Steps
It is to have ameeting on how they can encourage and involve every one to work and improve on their sanitation facilities.
CLTS Progress
Sanitation Hygiene Committee
no
Water Users Committee
no
Other Class Notes
Community Ownership
yes
Ownership Story
They were working on some of their home hygiene facilities for example,dish-racks,shower area,digging rubbish pit and smearing on their houses and kitchens.
Three Stone Fires
yes
Access to Clean Water
no
Open Defecation
yes
Water Access Explain
The members move longer distances to where the water source is,and also the well they have drys up during the dry seasons.
Prevent Ownership
Some few members don’t want to do what the committee members tells them what to do.
Allow Ownership
The committee members are had working and love to see that their village gets to change.
Village Notes
The members from nawandyo A have managed to teach a lot members from different homes in B how to make stoves.Also the member from A were moving home to home contributing money towards their borehole account.
Well Repair
Lookup Key
Ws Name
Repair Date
2018-05-28 00:00:00 UTC
Repair By
Kibo
Pump Mechanic
no
Committee Present
yes
Repair Cost
0
Village Contribution
170000
Work Done
They opened the borehole in order to get to know what was causing the less water out of the borehole during the dry seasons.
Parts Replaced
Concerns Future Failure
Unknown
Followup
yes
Water Committee
yes
Fence
yes
Soak Pit
yes
Compound Condition
good
Jerrycan Condition
dirty
Ws Notes
David ,Tyler and Steven went to nawandyo A to open up the borehole and find out what was causing the less flow of the water during the dry seasons. They found when the water committee members chaired by mr Mohamed Gasemba were waiting for them at the borehole. They started by opening up the borehole removed all the Parts out ,they discovered that the first cause for the less flow of the water during the dry seasons was that the borehole had issues with the pipes keeping breaking always reason being they were too old .Another reason for the less flow of the water was that the borehole had less pipes than it was before ,because originally the borehole had eight pipes but because of the two pipes which were removed reason being they were too old breaking into smaller parts they removed them and the borehole remained with only six p v c pipes . Therefore David and Steven after the opening process they realized that the other problem was also on the fewer p v c pipes which were not reaching up to the screen or up to the deeper water level which has got plenty of water.Also all the internal parts were spoilt and full of rust.After all that they fixed back all the parts they had removed out of the borehole. They concluded by saying that the parts which would be changed and replaced were as follows,the cylinder,pipes,bolts,third plate nipple adapter and the rods. They finished all that and talked to the residents and the water user committee members by encouraging them to start contributing money towards their borehole account and also advised them to always keep their borehole compound clean not forgetting to use cleaner gar-jets and always putting in mind that unity was the key factor for every villages success.During there way back to jinja they decide to do a follow up on the two homes in Nawandyo B which were lagging behind as far as hygiene and sanitation improvements are concerned.One of the homes was the home of mr waiswa who had left his home and the wife to , who had promised the Kibo staff that in a period of one week he will have completed his toilet . They found when he had not done anything.Also the second home they visited to was for mr Ibra also he had not done anything.For that reason the Kibo staff together with the committee members decided the next village visit to have a meeting on how they would bring those two members and everyone on board as far as sanitation improvements are concerned. Because the committee members were promising as a whole village to go in those two homes trying, to encourage them to improve reason being that the community members never wanted to miss a lot of developmental progress in their village because the two people
Operating
yes
Repair Notes
They were able to find out what the problem was .
Next Visit
2018-06-04 - Purpose: Having a water and sanitation meeting for both nawandyo A and B.
Program Success
Program Critical Needs
Program Ownership
Other Program Observations
Program Expected Of Village
Program Staff Preparations Next Visit
Report Photos
They were opening up the borehole to see what was causing the less flow of the waiter during the dry seasons.
They returned back the parts after they had realized the cause of the less flow of the water during the drying seasons.