Water Sanitation and Hygiene - Bukhudumira - Namutumba

Visit by David Balimunsi on 2018-08-29

Report ID
2731
Created by
David Balimunsi
Created date
2018-08-29 09:23:06 UTC
Modified by
David Balimunsi
Modified date
2018-08-30 09:09:47 UTC
Trip Time
09:28-17:50 (8 h 22 m)
Village Time
11:57-15:32 (3 h 35 m)
Travel Time
4 h 47 m

Current State

Participation Rating
Success
Their borehole has got plenty of water as well as a lot of hand washing facilities were constructed and seen under good use. 
Village Critical Needs
Fire saving stoves 
Village Action Steps
It is to take full ownership and care of their borehole 
Staff Action Steps
It is to encourage the member to continue working together as they take full care and ownership of their borehole 
CLTS Progress
 
Sanitation Hygiene Committee
yes 
Water Users Committee
yes 
Other Class Notes
 
Community Ownership
yes 
Ownership Story
The community raised the money the Kibo requested from the members 
Three Stone Fires
yes 
Access to Clean Water
yes 
Open Defecation
no 
Water Access Explain
 
Prevent Ownership
None 
Allow Ownership
Unity and cooperation among the members 
Village Notes
There is no case of open deification 

Well Repair

Lookup Key
 
Ws Name
 
Repair Date
2018-08-29 00:00:00 UTC 
Repair By
Kibo 
Pump Mechanic
yes 
Committee Present
yes 
Repair Cost
950000 
Village Contribution
250000 
Work Done
Replacing back of the new cylinder , top rod and the new head assembly 
Parts Replaced
Cylinder,Rods,Bolts,Pump head 
Concerns Future Failure
Unknown 
Followup
yes 
Water Committee
yes 
Fence
yes 
Soak Pit
yes 
Compound Condition
good 
Jerrycan Condition
clean 
Ws Notes
David Falcon and Steven were in Bukudumira to carry out the process of the borehole repair. When the Kibo staff reached the village, they found when the district hand pump mechanic kabugo had already opened up the borehole as it was earlier on communicated to him by the Kibo staff authorizing him to do the opening in order to save time. The Kibo staff reached the village when kabugo had already removed all the internal parts out of the borehole kabugo carried out the entire process while the water user committee members were around and the majority of the residents . The Kibo staff joined him ,they called for the committee members and showed them their new borehole parts which they had bought for them . The residents were so happy and the chairman who was a moslem first played for the Kibo,s long live while saving in the communities around the busoga region. Then later after wards the repair process started and the following are the parts which they replaced,the top rod,head assembly , cylinder and new bolts. After fixing back the above mentioned parts the Kibo staff and hand pump mechanic ,tested the borehole by pumping it . what they realized after pumping was that the flow of the water had increased more than it was before. They were all happy because the problem was solved. The whole repair process costed the Kibo staff 950000 shillings After all that the Kibo staff requested on the behalf of the village how best the borehole would be pumped.kabugo went ahead and demonstrated how best the borehole would be pumped,by not pumping while knocking up and down,not lifting yourself on the handle of the borehole. After the demonstration process the Kibo staff appreciated the hand pump mechanic ,and also continued advising them to take all the instructions and make good use of them not forgetting to continuing contributing money towards their borehole account always. The treasurer of the borehole told Kibo staff that they will be continuing contributing towards their borehole account on addition to the 250000 shillings they had as their account balance. On addition to that after the repair process Falcon,David and Steven moved in about three homes monitoring the hygiene and sanitation status. Out of the three homes they moved to they noted that they all didn’t have the fire saving stoves but the rest of the other facilities were in good status .Before they would continue with the home to home movement, the rains started and they had to stop from there. In general the the hygiene status of the entire village was good and the committee members promised to maintain the required standards. 
Operating
yes 
Repair Notes
The water user committee members were more active and cooperative ,hence the a mount of the flow of the water increased . 
Next Visit
2018-09-12 - Purpose: Monitoring the work of digging traces or trenches which would channels the running water away not flowing into contact directly to the open ground surface of the borehole .
Program Success
Program Critical Needs
Program Ownership
Other Program Observations
Program Expected Of Village
Program Staff Preparations Next Visit
 

Report Photos

4156 The old cylinder which used to cause issues causing the less flow of water
4159 They were repairing the borehole
4162
4165
4168 Replacing and fixing back of the new parts for example cylinder and the head assembly.