Water Sanitation and Hygiene - Nawandyo A - Namutumba

Visit by David Balimunsi on 2018-12-12

Report ID
3839
Created by
David Balimunsi
Created date
2018-12-13 05:15:49 UTC
Modified by
David Balimunsi
Modified date
2018-12-13 17:14:49 UTC
Trip Time
08:42-18:30 (9 h 48 m)
Village Time
11:06-04:15 (-7 h 9 m)
Travel Time
16 h 39 m

Current State

Participation Rating
Success
Facility sanitation improvements and standards 
Village Critical Needs
None 
Village Action Steps
It is to take good care and full ownership of their borehole 
Staff Action Steps
It is to carry out the borehole repair process as well as encouraging the village to take the full care and ownership of their borehole. 
CLTS Progress
CLTS completed 
Sanitation Hygiene Committee
yes 
Water Users Committee
yes 
Other Class Notes
 
Community Ownership
yes 
Ownership Story
Even the two homes which didn’t have latrines by the time the Kibo staff repaired the well they had them in their homes 
Three Stone Fires
yes 
Access to Clean Water
yes 
Open Defecation
no 
Water Access Explain
 
Prevent Ownership
None 
Allow Ownership
The committee members are hard working and concerned 
Village Notes
Everyone in the village is having a latrine hence no open deification 

Well Repair

Lookup Key
 
Ws Name
 
Repair Date
2018-12-12 00:00:00 UTC 
Repair By
Kibo 
Pump Mechanic
yes 
Committee Present
yes 
Repair Cost
950000 
Village Contribution
300000 
Work Done
The Kibo staff replaced the used parts that is new head assembly , top rod, cylinder and the bolts with new ones . 
Parts Replaced
Cylinder,Rods,Bolts,Middle plate,Pump head,Nipple adaptor 
Concerns Future Failure
Unknown 
Followup
yes 
Water Committee
yes 
Fence
yes 
Soak Pit
yes 
Compound Condition
good 
Jerrycan Condition
clean 
Ws Notes
David and Steven were in Nawandyo village upper section . Their intention of going there was to carry out the repair process of the borehole in there . The Kibo staff thought wisely by repairing the borehole in the upper section would reduce on the pressure from the two boreholes in Nawandyo A and B . At the village the Kibo staff found when the hand pump mechanic from the district mr kabugo along with all the water user committee members ,and village residents they had already removed the internal faulty borehole parts out of the borehole. David and Steven joined the H p M with his team at the borehole. The community members saw the new borehole parts and were so happy. Old men and women rejoiced by thanking Kibo for the great heart of giving. After all that David showed the members the new parts which were bought for them to replace the faulty ones which in the borehole. These were the new parts ,the head assembly,rods,cylinder and bolts. David and Steven along with mr kabugo fixed back all the new part to replace the old ones. They tested the flow of the water after the whole repair process. And the flow of the water hard increased than before . When the village residents realized that success they celebrated. Therefore David requested mr kabugo to demonstrate for them the rightful ways of pumping the borehole. The H p M demonstrated the two ways of pumping,that is the good ways and bad ways . The Kibo staff advised the community members to always lock up their borehole at night to avoid the miss use of it . They were advised to take full ownership and total care of their borehole by always continuing contributing towards their borehole account. Because the village had contributed 300000 shillings towards their borehole account and 50000 shillings were deducted and given to the hand pump mechanic as his labour fee . Yet the entire process had costed the Kibo 950000 shillings towards the buying of the new parts. Therefore they were advised to continue contributing towards their borehole account for the future sustainability of their borehole. In general according to the hygiene and sanitation status of the entire village they had maintained the required standards. Because of the limited time factor the David and Steven left the village in total joy and happiness. 
Operating
yes 
Repair Notes
The flow of the water from the borehole increased after the repair process 
Next Visit
2019-01-14 - Purpose: Assessing the status of the borehole as well as the sanitation standards
Program Success
Program Critical Needs
Program Ownership
Other Program Observations
Program Expected Of Village
Program Staff Preparations Next Visit
 

Report Photos

5252 The well repair process
5258 The status of the borehole in the village
5261 The H pm from the district Mr kabugo assessing the repair process
5264 The H P m from the district during the corse of the repair process
5267 The Kibo staff along with the Hp m during the borehole repair process.