Water Sanitation and Hygiene - Bulinda 1

Visit by David Balimunsi on 2019-10-04

Report ID
7010
Created by
David Balimunsi
Created date
2019-10-08 11:24:37 UTC
Modified by
David Balimunsi
Modified date
2019-10-10 12:05:39 UTC
Trip Time
09:00-21:17 (12 h 17 m)
Village Time
12:10-18:50 (6 h 40 m)
Travel Time
5 h 37 m

Well Repair

Lookup Key
 
Ws Name
 
Repair Date
2019-10-04 00:00:00 UTC 
Repair By
Kibo 
Pump Mechanic
no 
Committee Present
yes 
Repair Cost
Village Contribution
200000 
Work Done
Pump testing thus to get the dirty water out of borehole 
Parts Replaced
 
Concerns Future Failure
Unknown 
Followup
yes 
Water Committee
yes 
Fence
yes 
Soak Pit
yes 
Compound Condition
good 
Jerrycan Condition
clean 
Ws Notes
David,Steven along with zackAbney were in Belinda village. There intention of going there was to carry out the process of the borehole blowing as pump testing. That was done because the borehole had stayed for so long without the community members using it. Therefore David ,Steven and zack as they were at the borehole promise,they started on the generator which was connected to the water pump . They connected the generator along with the water pump which was inside the borehole. Because they wanted to let the dirty water out of the borehole. The process of blowing the borehole took the Kibo staff 3hours. But before even making it three hours the water had already cleared up. And it was ready for human consumption. Also on the side of pump testing process ,they did it because they wanted to know how long was the water which they had blew out of the borehole take to recover back . However they noted that it was 15 jerrycans in 8 minutes. Which was better on the side of the Kibo staff and the entire village. The Kibo staff carried out the two above mentioned process because it was extremely important due to the borehole water formation . In general according to the hygiene and sanitation status of the entire village was good .Except for the few homes which had the need to improve on their hand washing stations. 
Operating
no 
Repair Notes
The chairman of the borehole was very much concerned and hard working 
Next Visit
2019-10-14 - Purpose: To carry out the borehole repair process
Program Success
The borehole which was repaired is currently working and the sanitation has been well maintained
Program Critical Needs
None
Program Ownership
The chairman of the borehole is hard working
Other Program Observations
Unknown
Program Expected Of Village
The chairman of the borehole organizing the entire for a reminder and training about borehole ownership.
Program Staff Preparations Next Visit
To phone call the village through the village chairman and check how the mobilization for the village borehole meeting will have progressed.
 

Report Photos

9113 Kibo staff during the pump testing process
9116 Kibo staff du the pump testing process