Mr labani who roofed his latrine and built hand washing stand and awaits to plaster and cement which he never had on theprevious visit.
On going superstructure building on his latrine after being advised by keneth since the previous wall was cracked.
On going hand washing stand building
Drying rack built on standard which was not there onthe previous visit.
Bathroom height built up to cover owners height and drainage with soak pit put
New hand washing stand built