The successful water point after water drilling
61M were drilled and the borehole is estimated to pump 2500L per hour.
The community was very happy seeing the water
The successful water point that was drilled ready for pump testing and installation
Alex visited the borehole that was recently repaired by an aspiring member of parliament. This same borehole had been considered for repair by kibo in partnership with the village but looks like it’s done
The village members jubilated for two days and nights because of the joy.